Arun Valley Hydropower Development Company has constructed and operating Piluwakhola Small Hydropower Project at Sankhuwasava District in Koshi Zone. This is a run of river type project located in Eastern Part of the country at Piluwa River, a tributary of Arun River. The power purchase agreement with Nepal Electricity Authority (NEA) was completed in 2000 to supply 19.56GWh per annum. The construction of this project was started in March 2000 and completed in August 2003. The plant started commercial operation from 18 September 2003. The power generated from the project is synchronized into 33kV national grid close to the project and it helped to minimize the system losses. Nearly 300 villages of Sankhuwasabha, Terathum, Bhojpur and Dhankuta districts are directly benefited from the reliable supplied by this project. It has improved the livelihood of people of these areas.
Salient Features
Installed Capacity | 3.0 MW |
Design Discharge | 3.5 m3/sec |
Gross Head | 112.5 meters |
Contract Energy | 19.547 GWh |
Construction Period | 36 months |
Total Project Cost | NRs. 326.4 million |
Cost Per Kilowatt | US$ 1451 Per KW (1 US $ =NRs.75) |